What to check before grading a yard for masonry
Use existing levels and water patterns to plan the transition between lawn, pavers, gates and doors.

Start with fixed points
Show the estimator the back door, bottom step, driveway, gate and any utility covers that need to stay accessible. Agree where you expect the finished surface to meet each point.
Document the wet spots
Take photos after rainfall from the same place each time. A small low spot and water crossing the entire yard may need different responses. Note downspout outlets and the direction water currently travels.
Coordinate ground work and paving
If a tree, stump or fence lies on the equipment route, discuss it before the patio footprint is finalized. Ask which contractor will set the finished levels and who will verify them before the pavers are installed.
Spell out the lawn finish
A ground-shaping quote may end at rough grade or may include a finished soil surface. Put topsoil, seed, sod and displaced planting beds in writing when those are part of the desired result.