Describe the finished yard in one drawing
On a copy of your survey, outline the proposed patio, the area to be cleared and any wall. Mark trees that should stay. Use arrows to show where water runs now and where you expect it to go afterward. A reviewer can then see how cutting back a bank or filling a low spot relates to the paving.
Use the property address to find the reviewer
Call the town or incorporated village with the street address and tax lot if available. In Smithtown, the Village of the Branch, Nissequogue and Head of the Harbor each have a separate building department. Smithtown Engineering reviews residential site plans within its jurisdiction. Ask the first office which department reviews the surfaces, grade changes and trees shown on your sketch.
Flag a shoreline or wetland early
Tell the reviewer if there is a tidal creek, marsh or shoreline near the proposed work, even when it lies beyond your fence. New York’s Department of Environmental Conservation regulates certain activities in and around tidal wetlands. Its program provides maps and regional contacts. Ask how to confirm the status of the proposed work area before ordering fill or setting a construction date.
Keep the reviewed version with the estimate
Write down the drawing date, who you spoke with and which measurements or documents the office requested. Ask who will supply any revised survey or drawings and who will submit them. If you later widen the patio, raise the finished grade or move the wall, show the revised layout to the reviewer and contractor before treating the earlier answer as applicable.
Homeowner checklist
- Survey with clearing, fill and paving limits
- Property address and tax lot
- Drainage direction and nearby shoreline features
- Dated drawing and list of review contacts